← All dashboards

Plant Krakow-3 · Production floor

Which line / shift is degrading OEE, and where should the maintenance crew focus next?

Operational
Line A · running OEE 87% · cycle 41s · 12 hr
Line B · stopped Downtime 38m · OEE 71%
Line C · running OEE 92% · cycle 38s · 12 hr
Line D · changeover OEE 79% · setup in progress
First-pass yield Today
96.3%
0.4 ppvs 14d avg
Target: ≥ 96.0%
QC line scan · 3 min ago
Avg cycle time Today
42 s
2.4%vs 14d avg
Std: 41 s · UCL 44 s
PLC tag CT_AVG · 1 min ago
Downtime today All lines
52 min
22 minvs daily target
Target: ≤ 30 min/day
CMMS · 1 min ago

Where is OEE degraded across line × shift in the last 14 days?

% OEE · cells < 70% in red · sequential blue otherwise

Source: MES · OEE engine v2·

Which defect codes drive scrap?

last 14 days · top 10 codes · Pareto sorted desc

Source: QC · vision system·

How does downtime per shift compare to target across last 14 days?

minutes per shift (3 shifts/day) · dashed line = target 30 min/shift · red pin = unplanned stop

Source: MES · CMMS work orders·

OEE = Availability × Performance × Quality, computed per ISO 22400 over each 8-hour shift. Target 70% is plant-level threshold; alert fires below 60%. Downtime includes planned changeover + unplanned faults; pin marks ≥30-min unplanned stops.